Connector concept Engineering
Azure DevOps
Prepare a release readiness brief that joins planned work with the evidence produced by a build.
Explore the conceptWork items
Pipeline results
Release checklist
Azure DevOpsSource context
Human review
A practical scenario
A release owner needs a go-or-hold discussion packet. Join work-item acceptance criteria to pipeline evidence and list the manual checks still required in the intended environment.
Source material to consider
- Work items
- Pipeline results
- Release checklist
Before designing a connection
Distinguish a successful build from a successful deployment and preserve the environment attached to each result.